MARINE ENGINEERING SPECIALIST

MFV “Ella”

Project details

In 2019, KER Group were awarded the contract to supply the RSW, Vacuum Pump, Fish Hold, Air-Con, Ice Machine and Freezer to the MFV Ella.

3D Tour of Project

Works completed

  • Supplied a 275Kw R134a RSW system
  • Supplied a Vacuum Pump system, including 1 x Samson Ocean Master Vacuum Pump c/w Stainless Steel Casing.
  • Supplied Fish Hold Refrigeration, Stainless Steel Evaporators c/w Bitzer Sea Water Cooled Condensing Unit.
  • Supplied and installed a full heating and cooling Air Conditioning system in the accommodation, wheelhouse and galley areas.
  • Supplied and installed a BUUS 3t Flake Ice machine.
  • Sheeted the walk-in freezer and installed fibreglass, supplied the refrigeration system to cool the area and installed a stainless steel food rack along with a custom pedestrian door finished in stainless steel.
  • Supplied all the above systems including all copper, stainless steel, mild steel, polyethylene piping. All necessary coded welding for refrigeration piping. Complete electrical installation, electrical control cabinets manufactured in house and installed on board.
  • Commissioning of all systems.
All work was carried out by KER Group.

 

Location: Killybegs, Ireland
Client: Atlantic Dawn Group