KER Group were awarded the contract to retrofit 2 x 985Kw Ammonia RSW systems to the KFE owned MFV “Atlantic Challenge”.
MFV “Atlantic Challenge”
MFV “Atlantic Challenge”
Works completed
- Cutting section of the hull to remove old RSW components
- Removed old RSW system.
- Created 2 x new RSW rooms to meet DNV regulations for Ammonia systems.
- Installed the 2 x 985 KW systems.
- Removed circulation pipework in the centre corridor and replaced it with Polyethylene pipe.
- Removed existing circulating pumps and condenser pumps and replaced them with new Desmi pumps.
- Installed new Gas alarms and extraction fan system as per DNV regulations.
The project was completed in Killybegs Co. Donegal.