KER recently completed the works on the Seonag M which is a workboat which will be used in aquaculture/salmon farming industry. This was the last of 3 boats which KER were carrying out a project for. The Gracie Ava & Betty Bheag had been completed a few months prior. Below is a list of works that were completed on the boats.
Seonag M
𝐖𝐨𝐫𝐤𝐬 𝐂𝐨𝐦𝐩𝐥𝐞𝐭𝐞𝐝:
•Designed/Fitted 2 x 240V AC electrical panels, 1 x 400V AC electrical panel, 3 x 24V DC electrical panels.
•Removal of old Perkins 250KVA Generator.
•Supplied & wired-up new Doosan 130kva electrical generator which is more economical.
•Removal of old Vacuum Pump & piping.
•Installation of 220V LED floodlights.
•Supply & Installation of battery boxes.
•All necessary cabling & rewiring conducted by KER engineers.
Gracie Ava & Betty Bheag
𝐖𝐨𝐫𝐤𝐬 𝐂𝐨𝐦𝐩𝐥𝐞𝐭𝐞𝐝:
•Custom Stainless Steel battery boxes constructed by KER & installed with new batteries.
•New isolators for batteries.
•Earth fault panel designed, constructed & installed.
•New 210 watt LED floodlights installed.
•All float switches checked.