MARINE ENGINEERING SPECIALIST

Gracie Ava & Betty Bheag work vessels 1

Electrical Works On Aquaculture Workboats Completed

KER recently completed the works on the Seonag M which is a workboat which will be used in aquaculture/salmon farming industry. This was the last of 3 boats which KER were carrying out a project for. The Gracie Ava & Betty Bheag had been completed a few months prior. Below is a list of works that were completed on the boats.
Seonag M
๐–๐จ๐ซ๐ค๐ฌ ๐‚๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž๐:
โ€ขDesigned/Fitted 2 x 240V AC electrical panels, 1 x 400V AC electrical panel, 3 x 24V DC electrical panels.
โ€ขRemoval of old Perkins 250KVA Generator.
โ€ขSupplied & wired-up new Doosan 130kva electrical generator which is more economical.
โ€ขRemoval of old Vacuum Pump & piping.
โ€ขInstallation of 220V LED floodlights.
โ€ขSupply & Installation of battery boxes.
โ€ขAll necessary cabling & rewiring conducted by KER engineers.
Gracie Ava & Betty Bheag
๐–๐จ๐ซ๐ค๐ฌ ๐‚๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž๐:
โ€ขCustom Stainless Steel battery boxes constructed by KER & installed with new batteries.
โ€ขNew isolators for batteries.
โ€ขEarth fault panel designed, constructed & installed.
โ€ขNew 210 watt LED floodlights installed.
โ€ขAll float switches checked.
Read More

KER Install Infeed Hopper For Salmon Factory

KER recently installed salmon processing equipment for Kilkeerin Salmon, Galway, Ireland.
๐’๐ญ๐š๐ข๐ง๐ฅ๐ž๐ฌ๐ฌ ๐’๐ญ๐ž๐ž๐ฅ ๐ˆ๐ง๐Ÿ๐ž๐ž๐ ๐ก๐จ๐ฉ๐ฉ๐ž๐ซ: Fitted in Kilkerrin salmon factory last week. The tank’s purpose is to handle large fish like salmon which will be received from tankers via a pinch valve. Tank has a capacity of 22mยณ. Salmon are then taken from the tank via a hopper before being transported onwards for further processing.
๐๐ข๐ง๐œ๐ก ๐•๐š๐ฅ๐ฏ๐ž: Works using compressed air to inflate the rubber interior to form a water tight seal. This will stop fish & water flow with a strong focus on protecting fish from damage. This valve can be operated using a KER installed touchscreen.
๐‘๐ž๐ญ๐ฎ๐ซ๐ง ๐–๐š๐ญ๐ž๐ซ ๐•๐š๐ฅ๐ฏ๐ž: Automatically returns water to the tanker.
Read More
3 Generations-Celebratory Post

New KER Milestone Achieved!

3 Generations of KER

๐ŸŽ‰ Celebrating a Milestone: Three Generations, One Legacy ๐ŸŒŸ

KER Group marks a momentous occasion in its history, as three generations now proudly represent the company.

The picture attached captures the essence of family and dedication ๐Ÿ‘จโ€๐Ÿ‘ฉโ€๐Ÿ‘งโ€๐Ÿ‘ฆ๐Ÿ“ธ.

This significant milestone underscores their commitment to a shared legacy, laying a solid foundation for a promising future! ๐ŸŽŠ

Read More

New KER Group Careers Page

KER now have a brand new careers page on their website! This will give the latest updates on currently available jobs for the company. KER is constantly growing and looking for hard working and skilled employees to keep our production running efficiently and smoothly. Have a look at the roles we are currently searching for & see if your profile matches what we are looking for.

KER Careers Page>>>

 

Read More

KER Group awarded ISO 14001:2015 & 45001:2018

KER Group are delighted to announce that in addition to our ISO 9001:2015 Quality Accreditation that we have also been awarded both the ISO 14001:2015 Environmental Management and ISO 45001:2018 Occupational Health & Safety Accreditation’s.